{"id":23,"date":"2026-08-30T10:50:08","date_gmt":"2026-08-30T10:50:08","guid":{"rendered":"http:\/\/dlgwkmx.cluster131.hosting.ovh.net\/index.php\/en\/services\/"},"modified":"2026-08-30T10:50:08","modified_gmt":"2026-08-30T10:50:08","slug":"services","status":"publish","type":"page","link":"http:\/\/www.cytech.engineering\/index.php\/en\/services\/","title":{"rendered":"Services"},"content":{"rendered":"<p class=\"cy-kicker\">Services<\/p>\n<h2>What we deliver in the field<\/h2>\n<div class=\"cy-grid cy-grid-2\">\n<div class=\"cy-card\">\n<h3>Fixed-asset inventory<\/h3>\n<p>End-to-end physical inventory campaigns: preparation, tagging (barcode \/ RFID), collection, control and final reporting \u2014 from a single plant to 1 800+ telecom sites.<\/p>\n<\/div>\n<div class=\"cy-card\">\n<h3>Reconciliation &amp; valuation<\/h3>\n<p>Matching physical findings with the accounting fixed-asset register (revised SYSCOHADA), discrepancy settlement and valuation support.<\/p>\n<\/div>\n<div class=\"cy-card\">\n<h3>Labelling &amp; identification<\/h3>\n<p>Design and deployment of durable identification: polyester labels, RFID tags, coding rules aligned with your chart of accounts.<\/p>\n<\/div>\n<div class=\"cy-card\">\n<h3>Support, maintenance &amp; training<\/h3>\n<p>Training of your teams, maintenance of the installed base (software &amp; Zebra equipment) and ongoing assistance.<\/p>\n<\/div>\n<\/div>\n<div class=\"cy-split\">\n<figure class=\"cy-img\"><img decoding=\"async\" src=\"http:\/\/dlgwkmx.cluster131.hosting.ovh.net\/wp-content\/plugins\/cytech-website\/assets\/imgservices.jpg\" alt=\"Field inventory mission\" loading=\"lazy\"><\/figure>\n<div>\n<p class=\"cy-kicker\">Methodology<\/p>\n<h2>A proven 5-step approach<\/h2>\n<p><strong>1. Scoping<\/strong> \u2014 site census, coding rules, collection of existing files.<\/p>\n<p><strong>2. Preparation<\/strong> \u2014 equipment configuration, label printing, team training.<\/p>\n<p><strong>3. Collection<\/strong> \u2014 scan \/ RFID, photo, geolocation, offline mode with synchronisation.<\/p>\n<p><strong>4. Control &amp; reconciliation<\/strong> \u2014 quality checks, physical-to-book matching, discrepancy settlement.<\/p>\n<p><strong>5. Delivery<\/strong> \u2014 final reports, updated asset file, audit-ready evidence, handover.<\/p>\n<\/p><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>CYTECH ENGINEERING services: fixed-asset inventory, RFID\/barcode tagging, physical-to-accounting reconciliation, field teams and supervision across Cameroon and CEMAC.<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":18,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"cytech-page.php","meta":{"footnotes":""},"class_list":["post-23","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/www.cytech.engineering\/index.php\/wp-json\/wp\/v2\/pages\/23","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.cytech.engineering\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/www.cytech.engineering\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/www.cytech.engineering\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.cytech.engineering\/index.php\/wp-json\/wp\/v2\/comments?post=23"}],"version-history":[{"count":0,"href":"http:\/\/www.cytech.engineering\/index.php\/wp-json\/wp\/v2\/pages\/23\/revisions"}],"up":[{"embeddable":true,"href":"http:\/\/www.cytech.engineering\/index.php\/wp-json\/wp\/v2\/pages\/18"}],"wp:attachment":[{"href":"http:\/\/www.cytech.engineering\/index.php\/wp-json\/wp\/v2\/media?parent=23"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}